| Standard transparent balcony net | Rs 20-24/sq ft | Straight apartment-balcony openings with normal inside access and a sound perimeter for fixing. | Measured area, monofilament or net specification, border rope, hook material, spacing and minimum job charge. | Confirm whether measurement, material, hardware, labour, transport and taxes are included. |
| UV-stabilised HDPE bird net | Rs 22-28/sq ft | Sun-exposed balconies, larger spans and buyers wanting a documented black, white or green HDPE option. | Knotted or knotless construction, mesh size, twine specification, UV treatment, colour and installed area. | HDPE is a specific polymer; it should not automatically be described as nylon simply because both are sold as bird nets. |
| Verified branded or Garware option | Rs 30-35/sq ft within the usual guide; specialty quotes may be higher | Customers who want a named product with identifiable mesh, material, colour and manufacturer documentation. | Exact product, proof of supply, mesh size, order quantity, border system, fixing hardware and service terms. | Garware pigeon net price should be compared using the product name and proof—not a verbal brand claim. |
| Windows, AC ledges and service ducts | Rs 22-32/sq ft or minimum job charge | Small or irregular openings with pipe gaps, deep ledges, multiple corners or equipment needing future access. | Number of edges, AC clearance, duct depth, frame need, wall condition, cleaning access and separate service openings. | Small openings can cost more per square foot because setup and fixing work remain similar. |
| High-rise, common shaft or complex balcony | Rs 28-35/sq ft or measured quotation | Upper floors, L-shaped fronts, long spans, shared utility shafts and openings needing special access planning. | Floor height, safe work access, span, corner returns, facade rules, anchor base and association permissions. | The proposal should explain safe access and the complete perimeter—not charge only for the visible front width. |
| Several flats or full-building bird control | Project quotation after common survey | Societies, facility managers, villas, warehouses and buildings with repeated balconies, shafts or facade ledges. | Total area, access method, repeated layouts, common permissions, work schedule, frames and handover requirements. | A coordinated plan helps stop pigeons shifting from one untreated opening to the next. |